In order to book in the graphical table plan, the table numbers must be linked to the objects on the graphic. Without this link, table allocations are only possible through the list or timeline view.
- Activate the
/
One-click table menu above the plan. This will hide the the options for graphic editing, so you can concentrate on the options for table management in the context menu.
Note: Only the cursor must be selected in the left-hand toolbar of the graphics programme, no other tool may be selected.
- Select a table in the table plan.
- Right-click and select (p.ex.)
Assign table 4 to assign one of the unlinked table numbers. In the table plan, the table is coloured dark blue for confirmation and the last column in the list of tables on the right is ticked.
Note: Each number refers to an independent object. Grouped objects only receive one number. If you have not activated the one-click table menu, select Assign objects.
- Alternatively, select an object (table) in the table plan, select a row in the table list and left-click to tick the box in the right-hand column
Object assigned in the table plan.
- If required, remove the assignment by right-clicking on the object and selecting Remove assignment, or by unticking in the list. To remove the assignment for several tables, select the tables in the list, click on the column
Object assigned in the table plan and select Remove assignment.